Smarter
equipment.
More productive
track work.

Purpose-built equipment for
railroad construction and track maintenance.

BUILT IN SWEDEN.
MADE FOR A STRONGER RAILWAY TOMORROW

BUILT TO GET MORE
DONE ON TRACK

Real solutions
for real railroad work.

Our equipment is designed to increase productivity, reduce manual work and help crews work safer and more efficiently.

  • HIGHER PRODUCTIVITY

    Complete more work in every possession

  • IMPROVED SAFETY

    Add more detail about this feature, such as benefits, appearance, components

  • BUILT FOR DEMANDING WORK

    Reliable, robust and proven in real conditions

OUR SOLUTIONS

Engineered for every
stage of the track lifecycle.

From clip installation to tie replacement and tie laying. Rosenqvist Rail offers a complete range och solutons for more efficient track work.

CD200 IQ e-clip

Make clip work smarter. 

  • Up to 10 ties/min

  • Handles rails up to R136

  • Two clips per cycle

  • Adjustable track gauge

  • Walk-behind application

CD400SP IQ

Step away. Stay in control.

  • Up to 25 ties/min

  • Remote-controlled

  • Intelligent automation

  • Fleet management

  • Fastclip and e-clip

Sleeper Layers

4-8 ties. One movement

  • Handles up t 8 ties

  • Up to 150 meters/hour

  • Adjustable tie spacing

  • Telescopic design

  • Lifting capacity up to 3600kg

Tie Replacer SB60

Complete tie change

  • Excavate, remove and install

  • side or track operation

  • 1.400 kg gripping force

  • Multiple track gauges

  • Optional Automaster

IN ACTION

See the difference on track.

Our equipment is trusted by railway professionals around the world. Watch how Rosenqvist Rail helps crews get more done - faster, safer and smarter.

One Purpose. Multiple Solutions.

Every railway project depends on efficient clip installation and removal.

That's why Rosenqvist Rail has developed a range of solutions designed to match different working methods, project sizes and productivity requirements. From compact battery-powered tools to high-capacity clipping machines, each solution is built to improve safety, reduce manual work and maximise efficiency on track.

Clipping Made Easy

The CD100B gives railway teams a faster and safer alternative to manual clipping tools.

Lightweight, battery-powered and easy to transport, it helps operators complete maintenance work with less physical effort and greater efficiency. The result is a more productive workflow, improved ergonomics and greater flexibility wherever the job takes place.

More Productivity.
Less Manual Work.

The CD200 IQ helps railway contractors complete clipping operations faster and with fewer manual tasks.

Combining intelligent functionality with proven reliability, it delivers consistent results, improved ergonomics and a more efficient workflow for both maintenance and construction projects.

Built for High-Output
Track Work

The CD300 series is designed for projects where productivity, consistency and track access time matter most.

By automating the clipping process and delivering high-capacity performance, the CD300 helps contractors complete more work in less time while maintaining a high level of accuracy and operational reliability.

Safety First. Productivity Always.

For more than 30 years, Rosenqvist Rail has developed equipment designed to help railway teams work safer, smarter and more efficiently.

From sleeper replacement and fastening operations to rail handling and stress management, our solutions help maximise output in every track possession.

Discover how the right equipment can improve safety, increase productivity and reduce the total cost of maintenance.